HOME > INVESTMENT GUIDE > INVESTMENT PROJECTS
 

1

INFRASTRUCTURE


NO.1
Name of the Project Maoming Railroad to the Harbour
Description of Project:The project, the railroad from Maoming East Station 
to Maoming Port, is one of the key projects of Maoming government. 33.91 km 
long adding to the existing 6 km railroad to the ethylene line. The project has 
been permitted by the provincial Development and Planning Commission.
Total Investment: US$ 400
Chinese Contribution to offer land in terms of US$8 million 
Foreign Contribution US$ 32 million
Projected Time for Reimbursement:6.5 years including construction period
Project Site:newly built, the railroad from Maoming East Station to Maoming 
Port
Infrastructure Condition: fully complete.
Cooperation Form:joint venture or sole foreign investment 
Intending Duration of Cooperation subject to negotiation 
Contact Person Li Fu-wen Tel.: 0668 2822012 Fax:0668 2821113
Attachment:Description of Chinese Partner: 
General Situation: Maoming Communications Construction Development 
Company, set-up in 1991, registered capital: RMB٤35 million Business scope 
covers development and construction projects of highway, bridge, dock, railroad 
and airport and so on
Technological & Operational Conditions: run well

No.2 
Name of the Project: A Railroad to Bohe New Port of Maoming 
Description of project: The project of A Railroad to Bohe New Port of 
Maoming, one of the municipal key projects, 48 km, is planned from Dianbai 
Station of Sansui-to-Maoming Railroad in the north leading to Bohe New Port 
by way of towns of Lintou, Daya, Shuzai and Diancheng. The whole line will be 
constructed in the basis of the 2nd class standard for local railroads. 
Total Investment: US$ 80 million 
Chinese Contribution: invested in term of existing land (converted into US$ 8 
million)
Foreign Contribution: US$72 million
Project Site: newly built, from Dianbai Station to Bohe New Port
Projected Time for Reimbursement: 15.5 years (including building period)
Infrastructure Condition: All the conditions for construction is ready.
Cooperation Form: joint venture or sole foreign investment
Intending Duration of Cooperation: negotiable 
Contact Person Li Fu-wen Chen Yao Tel.:0668 2822012 Fax: 0668 2822112
Attachment: Description of Chinese Partner:
General Situation: Maoming Transportation Construction Development Corp. 
state-own, situated by Zhanqian W. Road, Maoming, set up in 1991, 59 staff 
members, registered capital: RMB٤35 million. 
Technological & Operational Conditions: run well

No. 3
Name of the Project: 1st Class Road of Maoming-to-Yangjiang-Expressway 
Exit of Mata Leading to Bohe New Port 
Description of project:The project of 1st Class Road of 
Maoming-to-Yangjiang-Expressway Exit leading to Bohe New Port, one of the 
municipal key projects, 44.96 km, is planned from Mata outlet, an exit of 
Maoming-to-Yangjiang-expressway to Bohe New Port by way of Changshan 
Primary School of Dianbai, over G325 road. The load for bridges and culverts 
refer to more than 20 levels for motor vehicles and 120 tons of trailers. 
Total Investment: US$120 million 
Chinese Contribution invested in term of existing land (converted into US$ 20 
million)
Foreign Contribution: US$100 million
Project Site: newly built, from the Maoming-to-Yangjiang-expressway exit to 
Bohe New Port
Projected Time for Reimbursement: 10 years
Infrastructure Condition: All the conditions for construction is ready.
Cooperation Form: joint venture or sole foreign investment
Intending Duration of Cooperation: negotiable 
Contact Person: Li Fu-wen Chen Yao Tel.:0668 2822012 Fax: 0668 2822112
Attachment: Description of Chinese Partner:
General Situation: Maoming Transportation Construction Development Corp. 
state-own, situated by Zhanqian W. Road, Maoming, set up in 1991, 59 staff 
members, registered capital: RMB٤35 million. 
Technological & Operational Conditions: run well

No.4 
Name of the Project: A Cannel with a capacity of 1,0000 tons in Bohe New 
Port of Maoming
Description of project: The project of A Cannel with a capacity of 1,0000 tons 
in Bohe New Port of Maoming is one of the municipal key projects, of which 
the whole length is 7.4km, the bottom elevation 8.5 m, the width 100m. The 
cannel is planned up to 300,000 tons for the forward planning. 
Total Investment: US$12 million
Chinese Contribution:US$ 1 million
Foreign Contribution:US$ 11 million
Project Site: in Bohe New Port of Maoming
Projected Time for Reimbursement: 10 years
Infrastructure Condition: All the conditions for construction is ready.
Cooperation Form: joint venture, contractual venture or sole foreign 
investment
Intending Duration of Cooperation: negotiable 
Contact Person: Li Fu-wen Chen Yao Tel.:0668 2822012 Fax: 0668 2822112
Attachment: Description of Chinese Partner:
General Situation: Maoming Transportation Construction Development Corp. 
state-own, situated by Zhanqian W. Road, Maoming, set up in 1991, 59 staff 
members, registered capital: RMB٤35 million. 
Technological & Operational Conditions: run well

NO.5
Name of the Project 30000 Tons Grade Dock of Maoming Port
Description of Project: Newly built 30000 Tons Grade Dock and of Its 
Pertained Engineering of Maoming Port consists of cargo, container and 
chemicals berths with a capacity of 1000,000 tons per year. The project has been 
permitted by the provincial Development and Planning Commission
Total Investment: US$ 15.36 million 
Chinese Contribution US$ 14.10 million 
Foreign Contribution US$ 1.26 million
Projected Time for Reimbursement 10 years 
Project Site: east to the path to the port in the area of Shuidong port, Maoming.
Infrastructure Condition: fully complete 
Cooperation Form joint venture or contractual management
Intending Duration of Cooperation: 20 years
Contact Person: Mai De-qing Tel.: 0668-5523266 Fax:0668-5523266
Attachment:Description of Chinese Partner:
Genetal Situation: Maoming Port Administration Bureau, address: 17 Shuidong 
Qiaonan Road, Dianbai, Maoming, Guangdong, State-own, setup in 
October,1987, now possesses 4 berths with a capacity of 950,000 tons per year. 
Technological & Operational Conditions:running well with a well equipped 
port and qualified technicians

NO.6
Name of the Project Guangdong Maoming Logistics Center
Description of Project Newly built 16 warehouses with an area of 48000 
sq.meters; 110 transport vehicles; 6 transport ships; a set of computers and 
network wares. After put into production the turnover will reach RMB٤423.68 
million.
Total Investment US$ 22.07 million
Chinese Contribution US$ 7.62 million including US$ 1 million in cash and in 
terms of warehouse, tanks, transport vehicles and so on. 
Foreign Contribution invest in cash and/or in part of equipment incl. transport 
vehicles and so on
Projected Time for Reimbursement: 5 years 
Project Site: In Maoming Port 
Infrastructure Condition: With convenient transportation, telecommunication 
and full supply of water and electricity
Cooperation Form subject to negotiation
Intending Duration of Cooperation: subject to negotiation 
Contact Person: Cai Guojin Tel.:0668-2288064 Fax:0668 2285145
Attachment: Description of Chinese Partner:
General Situation: Maoming Technical Reform Co.Ltd.setup in 
August,1998,state-own,at 63 Youcheng 4th Road,Maoming
Technological & Operational Conditions: run well

ˇˇ

ˇˇ
ˇˇ

Bureau of foreign trade & economic cooperation
Post Code:525000ˇˇTel:0668-2288750ˇˇE-mail:wjm@maoming.gov.cn

ˇˇ

ˇˇ